Columbia Energy Center – Main Steam/Control Stop Valve Replacement

Combined-cycle power generation facility

Project Summary

United supported the Columbia Energy Center with the design coordination, procurement, fabrication, and field replacement of a main steam/control stop valve during a scheduled outage. The scope included piping and structural modifications to the existing main steam system, procurement of critical materials, in-house fabrication, and coordinated field installation in an operating power generation environment.

Key Differentiators
  • Engineering coordination for piping and structural modifications
  • Procurement of forged wye block, P91 piping, and structural steel
  • In-house fabrication of piping components
  • Main steam/control stop valve replacement
  • P91 piping installation
  • Structural modification support
  • Field installation during scheduled outage
  • Coordination with plant personnel, subcontractors, and inspection teams
Technical Capabilities
  • P91 and high-alloy piping
  • Specialty welding
  • Field machining
  • Structural modifications
  • Engineered heavy rigging
  • Piping fabrication
  • Operating plant execution
  • Outage planning and coordination
  • Critical-path mechanical work
Project Impact

The project required precise coordination of engineering, procurement, fabrication, and field execution within a defined outage window. United completed the work with no lost-time incidents, no quality issues, and disciplined adherence to customer requirements, demonstrating the ability to safely execute high-consequence mechanical work in an operating power generation facility.