Project Summary
United supported the construction and commissioning of a new Linde Air Separation Unit (ASU) at the Samsung semiconductor facility in Taylor, Texas through the execution of high-purity instrumentation tubing installation, orbital welding, and commissioning support services. Work was performed in an active outdoor construction environment and required strict adherence to semiconductor-grade cleanliness, weld integrity, and UHP quality standards.
Key Services Delivered
- Field routing of instrumentation tubing systems using hook-up drawings and P&IDs
- Installation of tubing supports and cable tray systems
- Installation of instrument stands and instrumentation devices
- Orbital autogenous welding of stainless-steel instrumentation tubing
- Purging and cleanliness control for high-purity systems
- Commissioning support, including field modifications and additional tubing installation
Technical Capabilities
- High Purity (HP) and Ultra High Purity (UHP) welding
- Orbital welding qualification and coupon testing
- Semiconductor instrumentation system installation
- Field routing and commissioning integration
- Stainless instrumentation tubing fabrication and installation
Project Impact
The project required precise execution and close coordination with Linde’s engineering and commissioning teams to support critical process gas and instrumentation systems. United’s ability to perform high-purity welding and field modifications in a dynamic construction environment helped support successful system integration and commissioning readiness.





