Project Summary
United provided specialized orbital welding services supporting the installation of high-purity stainless steel tubing systems within the Linde ASU Phase 1 facility at the TSMC semiconductor site in Phoenix, Arizona. Work was executed in coordination with field routing operations and required strict adherence to semiconductor-grade weld quality and cleanliness standards.
Key Services Delivered
- Orbital autogenous welding on stainless steel tubing from ¼” to ½”
- Coordination with field routing and installation teams
- High-purity tubing system welding for semiconductor gas delivery applications
- Outdoor welding execution under controlled quality standards
- Precision weld parameter control for repeatable UHP weld quality
Technical Capabilities
- Orbital autogenous welding on stainless steel tubing from ¼” to ½”
- Coordination with field routing and installation teams
- High-purity tubing system welding for semiconductor gas delivery applications
- Outdoor welding execution under controlled quality standards
- Precision weld parameter control for repeatable UHP weld quality
Project Impact
The project required highly controlled orbital welding execution to support the installation of critical gas delivery systems within a semiconductor manufacturing environment. United’s ability to maintain repeatable weld quality and cleanliness standards in an outdoor construction setting helped support the integrity and reliability of the installed systems.





